首页 | 本学科首页   官方微博 | 高级检索  
     检索      

考虑经济相关性的复杂二维保修装备组合维修策略
引用本文:董恩志,程中华,王荣财.考虑经济相关性的复杂二维保修装备组合维修策略[J].系统工程与电子技术,2022,44(7):2219-2228.
作者姓名:董恩志  程中华  王荣财
作者单位:1. 陆军工程大学石家庄校区, 河北 石家庄 0500032. 河北省机械设备状态检测与评价重点实验室, 河北 石家庄 050003
基金项目:国家自然科学基金(71871219)
摘    要:针对保修期内孤立地对各单部件进行维修增加装备保修费用的问题, 结合复杂装备的二维保修现状, 以保修期内的保修费用为主要定量化分析指标, 以单部件二维预防性维修费用模型为基础, 将研究对象由单部件系统拓展到包含串联多部件系统的复杂装备。引入预防性维修基准间隔期, 采用组合维修的方法, 将各单部件预防性维修工作组合优化, 建立了多部件系统二维预防性组合维修费用模型。最后, 实例分析验证了该方法的可行性,可为二维预防性维修服务下多部件系统组合维修策略的制订提供科学依据与定量化分析方法。

关 键 词:经济相关性  复杂装备  二维保修  二维预防性维修  组合维修  
收稿时间:2021-04-23

Combined maintenance strategy of complex two-dimensional warranty equipment considering economic dependence
Enzhi DONG,Zhonghua CHENG,Rongcai WANG.Combined maintenance strategy of complex two-dimensional warranty equipment considering economic dependence[J].System Engineering and Electronics,2022,44(7):2219-2228.
Authors:Enzhi DONG  Zhonghua CHENG  Rongcai WANG
Institution:1. Shijiazhuang Campus, Army Engineering University, Shijiazhuang 050003, China2. Hebei Key Laboratory of Condition Monitoring and Assessment of Mechanical Equipment, Shijiazhuang 050003, China
Abstract:In order to solve the problem of increasing the maintenance cost of the contractor by maintaining each single component in isolation during the warranty period, combined with the maintenance status of complex equipment, based on the two-dimensional preventive maintenance cost model of single component, the research object is expanded from single component system to complex equipment including series multi component system with the main quantitative analysis index of warranty cost during the warranty period. Based on the introduction of preventive maintenance benchmark interval and the method of combined maintenance, a two-dimensional preventive combined maintenance cost model of multi-component system is established. Finally, an example is given to verify the feasibility of the method. This strategy can provide a scientific basis and quantitative analysis method for the formulation of multi component system combined maintenance strategy under two-dimensional preventive maintenance service.
Keywords:economic dependence  complex equipment  two-dimensional warranty  two-dimensional preventive maintenance  combined maintenance  
点击此处可从《系统工程与电子技术》浏览原始摘要信息
点击此处可从《系统工程与电子技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号