首页 | 本学科首页   官方微博 | 高级检索  
     检索      

单榀钢混框架结构内爆法拆除模拟
引用本文:李胜林,王宇涛,黄明升,刘凯,骆之悦.单榀钢混框架结构内爆法拆除模拟[J].北京理工大学学报,2012,32(4):354-357,385.
作者姓名:李胜林  王宇涛  黄明升  刘凯  骆之悦
作者单位:中国矿业大学(北京)力学与建筑工程学院,北京,100083;中国矿业大学(北京)力学与建筑工程学院,北京,100083;中国矿业大学(北京)力学与建筑工程学院,北京,100083;中国矿业大学(北京)力学与建筑工程学院,北京,100083;中国矿业大学(北京)力学与建筑工程学院,北京,100083
摘    要:为了研究内爆法拆除混凝土框架结构的基本规律,作者使用LS-DYNA中的MAT159本构,采用分离式constrained方法建立钢筋混凝土模型,建立了一个10层5跨的混凝土单榀结构模型,待重力平衡后,采用不同拆除顺序对内爆拆除进行了数值模拟.模拟结果显示了不同内爆方法的倒塌规律,并提出了延期时间的确定原则.

关 键 词:分离式模型  数值模拟  单榀框架  延期时间
收稿时间:6/2/2011 12:00:00 AM

Numerical Simulation of Single Concrete Framework Implosion Demolition
LI Sheng-lin,WANG Yu-tao,HUANG Ming-sheng,LIU Kai and LUO Zhi-yue.Numerical Simulation of Single Concrete Framework Implosion Demolition[J].Journal of Beijing Institute of Technology(Natural Science Edition),2012,32(4):354-357,385.
Authors:LI Sheng-lin  WANG Yu-tao  HUANG Ming-sheng  LIU Kai and LUO Zhi-yue
Institution:School of Mechannics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China;School of Mechannics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China;School of Mechannics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China;School of Mechannics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China;School of Mechannics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China
Abstract:To find out the basic law of the concrete frame structure implosion demolition, the model of single concrete framework of ten stories with five-span frame was constructed by using MAT159 software and adopting separating constrained method to simulate reinforced concrete. First, the gravity balance was executed. Then, the numerical simulation was implemented according to the designed different sequences of implosion demolition. From the results of simulation, the collapsed rules could be achieved. Also the criterion to determine the delay time could be put forward.
Keywords:separating constrained model  numerical simulation  single framework  delay time
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《北京理工大学学报》浏览原始摘要信息
点击此处可从《北京理工大学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号