首页 | 本学科首页   官方微博 | 高级检索  
     检索      


The design of Three Gorges Hydropower Station
Authors:Zhou Shud  Xie Hongbing
Institution:Zhou Shuda,Xie Hongbing (Changjiang Institute of Survey,Planning,Design and Research,Changjiang Water Resources Commission,Wuhan 430010,China)
Abstract:Using physical model and numerical simulation techniques,some technical problems were studied systematically,including layout of power station,measures of sediment and floating debris discharging,types of intake,embedded types of spiral case,layout of underground powerhouse tunnel group and block reinforcement.It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks +underground powerhouse in the right bank,as well as the intake with a single and small orifice....
Keywords:Three Gorges Power Station  layout  sediment and floating debris discharging  spiral case embedding  shallow embedment  block reinforcement
本文献已被 CNKI 等数据库收录!
点击此处可从《工程科学》浏览原始摘要信息
点击此处可从《工程科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号