The design of Three Gorges Hydropower Station |
| |
Authors: | Zhou Shud Xie Hongbing |
| |
Institution: | Zhou Shuda,Xie Hongbing (Changjiang Institute of Survey,Planning,Design and Research,Changjiang Water Resources Commission,Wuhan 430010,China) |
| |
Abstract: | Using physical model and numerical simulation techniques,some technical problems were studied systematically,including layout of power station,measures of sediment and floating debris discharging,types of intake,embedded types of spiral case,layout of underground powerhouse tunnel group and block reinforcement.It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks +underground powerhouse in the right bank,as well as the intake with a single and small orifice.... |
| |
Keywords: | Three Gorges Power Station layout sediment and floating debris discharging spiral case embedding shallow embedment block reinforcement |
本文献已被 CNKI 等数据库收录! |
| 点击此处可从《工程科学》浏览原始摘要信息 |
| 点击此处可从《工程科学》下载免费的PDF全文 |
|