首页 | 本学科首页   官方微博 | 高级检索  
     检索      

煤层气藏地面勘探开发选区灰色模糊评价
引用本文:陈天宇,冯夏庭,梁冰,孙维吉.煤层气藏地面勘探开发选区灰色模糊评价[J].东北大学学报(自然科学版),2013,34(3):429-432.
作者姓名:陈天宇  冯夏庭  梁冰  孙维吉
作者单位:1. 东北大学深部金属矿山安全开采教育部重点实验室,辽宁沈阳,110819
2. 东北大学深部金属矿山安全开采教育部重点实验室,辽宁沈阳 110819;中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖南武汉430071
3. 辽宁工程技术大学力学与工程学院,辽宁阜新,123000
基金项目:国家重点基础研究发展计划项目,国家自然科学青年基金资助项目,辽宁省自然科学基金资助项目
摘    要:采用灰色关联分析方法确定了评价指标的权重,利用多级和梯形隶属度函数确定了指标的单因素评价,建立了煤层气资源地面开发选区模糊综合评价模型.利用Matlab编制了CBMES(coalbedmethaneevaluationsystem),对辽宁省7个主要煤田煤层气地面开发可行性进行了模糊综合评价.根据评价结果,各评价指标中煤层渗透率和含气量所占权重较大,其他指标权重由大到小依次为:煤层厚度、煤级、资源量、资源丰度、煤层压力、埋深.辽宁省各煤田煤层气开发可行性为:阜新煤田>铁法煤田>抚顺煤田>红阳煤田>沈北煤田>康平煤田>南票煤田,评价结果与实际开发情况吻合较好,证明了所建立模糊综合评价模型的合理性.

关 键 词:煤层气  地面开发  选区  灰色分析  模糊综合评价  

Grey Fuzzy Evaluation of CBM Development and Area Selection
Chen,Tian-Yu ,Feng,Xia-Ting ,Liang,Bing ,Sun,Wei-Ji.Grey Fuzzy Evaluation of CBM Development and Area Selection[J].Journal of Northeastern University(Natural Science),2013,34(3):429-432.
Authors:Chen  Tian-Yu  Feng  Xia-Ting  Liang  Bing  Sun  Wei-Ji
Institution:(1) Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines, Northeastern University, Shenyang 110819, China; (2) State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China; (3) School of Mechanics and Engineering, Liaoning Technical University, Fuxin 123000, China
Abstract:The weights of evaluation indexes were confirmed by grey correlation analysis. Single-factor fuzzy evaluation was determined by multi-stage and trapezoid membership function. Fuzzy comprehensive evaluation model for the feasibility study of CBM development was established. Based on the fuzzy comprehensive evaluation model CBMES (coal bed methane evaluation system) was developed by using Matlab, and it was employed to evaluate the CBM development feasibilities of seven main coalfields in Liaoning Province. According to the evaluation results, the weights of coal permeability and methane content are higher. Other indices, such as thickness of coal bed, coal rank, resource capacity, resources abundance, coal bed pressure, and burial depth are ranked in descending weight order. The feasibility of CBM development ranked in descending order is: Fuxin coal field, Tiefa coal field, Fushun coal field, Hongyang coal field, Shenbei coal field, Kangping coal field, and Nanpiao coal field. The results are in agreement with the in situ condition, which shows the rationality of fuzzy comprehensive evaluation model for the CBM development feasibility.
Keywords:CBM(coal bed methane)  ground development  area selection  grey analysis  fuzzy comprehensive evaluation  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《东北大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《东北大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号