巴彦高勒矿井供电系统主变压器方案的选择
引用本文:李晋斌.巴彦高勒矿井供电系统主变压器方案的选择[J].山西科技,2012(6):87-88.
作者姓名:李晋斌
作者单位:山西省煤炭规划设计院,山西太原,030045
摘    要:通过对巴彦高勒矿井供电系统110 kV主变压器两个方案的技术经济比较,得出选择方案二的结论,即主变压器选用3台SZ11-25000/110 110/10.5 kV 25 000 kVA三相自冷式有载调压变压器,正常2台运行,1台备用。

关 键 词:供电系统  主变压器  方案  选择

Selection of the Main Transformer of the Power Supply System of the Coalmine of Bayan Gol
LI Jinbin.Selection of the Main Transformer of the Power Supply System of the Coalmine of Bayan Gol[J].Shanxi Science and Technology,2012(6):87-88.
Authors:LI Jinbin
Abstract:Based on the technological and economic comparison of the two plans of the 110kV transformer of the power supply system of the coalmine of Bayan Gol, the second plan, the main transformer of three SZll-25000'110, 110/10.5 kV, 25 000 kVA three phase self cooling load regulating transformers, in which two are in normal operation and one is in reserve, is chosen.
Keywords:power supply system  main transformer  plan  selection