摘    要:岩滩水电站升船目前国内最大的下水式垂直升船机,设计通航能力国250t。塔柱是该升船机的承重本体,总高度为106m,设计要求从165.1m高程到237.6m高程段框格薄墙体高72.5m使用滑模施工,为今后龙滩水电站船机的施工提供资料。

关 键 词:滑模技术  框格结构  塔柱  施工  升船机  水电站
收稿时间:1996/2/28 0:00:00
修稿时间:1996/5/29 0:00:00

Research on Application of the Large Sliding Formwork Technique of Gridiron Structure
Zhang Zhenhuai.Research on Application of the Large Sliding Formwork Technique of Gridiron Structure[J].Guangxi Sciences,1996,3(3):73-76.
Authors:Zhang Zhenhuai
Institution:Guangxi Hydroelectric Construction Burean, 1 East Mingxiu Road, Nanning, Guangxi, 530001
Abstract:With 250 t navigation capacity of design, the ship lift of Yantan hydroelectric project is the largest vertical ship lift of entering the water at present in China. The tower column of total length 106 m is main body for bearing weight, and sliding formwork shall be required to be used in the 72. 5 m long thin gridiron wall at the elevation of from 165. 1 m to 237. 6 m by design, the above requirement provides information and experience for the ship lift construction of Longtan Hydroelectric Project in the future.
Keywords:sliding formwork  gridiron structure  construction of tower column  ship lifter
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《广西科学》浏览原始摘要信息
点击此处可从《广西科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号