[1]张静. 我国铁路快捷货运班列开行方案研究[D]. 北京:北京交通大学, 2011.
[2]兰劲棕. 我国铁路快捷货物运输组织相关问题研究[D].成都:西南交通大学, 2011.
[3]许旺土. 综合快捷货运服务网络运输能力计算方法研究[D]. 北京:北京交通大学, 2010.
[4] MAIA L C, do COUTO A F. An innovative freight traffic assignment model for multimodal networks[J]. Computers in Industry, 2013, 64(2):121127.
[5] BAI R B, WALLACE S W,LI J P, et al. Stochastic service network design with rerouting[J]. Transportation Research Part B Methodological, 2014, 60:5065.
[6] HAJIAGHAEIKESHTELI M, M AMINNAYERI. Solving the integrated scheduling of production and rail transportation problem by Keshtel algorithm[J]. Applied Soft Computing, 2014, 25:184203.
[7]刘杰, 何世伟, 宋瑞,等. 铁路既有繁忙干线货运产品布局优化模型及算法[J]. 北京交通大学学报, 2013, 37(6):9198.
[8]SOYSTER A L. Convex programming with setinclusive constraints and applications to inexact linear programming[J]. Operations Research, 1973, 21(5):11541157.
[9] NAJAFI M,ESHGHI K,DULLAERT W. A multiobjective robust optimization model for logistics planning in the earthquake response phase[J]. Transportation Research Part E Logistics & Transportation Review, 2013, 49(1):217249.
[10]李婷婷, 宋瑞. 国家层面综合客运枢纽分层布局鲁棒优化模型[J]. 东南大学学报(自然科学版), 2015, 45(1):189195.
[11]LIU X C, HE S W, SONG R, et al. Robust optimization model and algorithm for railway freight center location problem in uncertain environment[J]. Computational Intelligence & Neuroscience, 2014, 2014:607159.
[12]郭玉华, 何世伟, 王保华. 铁路中转班列开行方案优化研究[J]. 铁道学报, 2011, 33(5):8-13.
[13]王保华, 何世伟. 不确定环境下物流中心选址鲁棒优化模型及其算法[J]. 交通运输系统工程与信息, 2009, 9(2):6974.
[14]王莹, 刘军. 铁路行包快运专列开行方案优化编制方法的研究[J]. 交通运输系统工程与信息, 2007, 7(3):125129.
[15]KHAN M B, ZHOU X S. Stochastic optimization model and solution algorithm for robust doubletrack traintimetabling problem[J]. IEEE Transactions on Intelligent Transportation Systems, 2010, 11(1):8189.
[16]许越. 集装化运输模式下快捷货运服务网络优化设计研究[D]. 北京:北京交通大学, 2015. |